Affiliated Projects
Al Maleh Permanent Production Facilities and Modification in Tanak
Client: | Al Furat Petroleum Co. / Shell |
Project Location: | Syria |
Status: | Completed |
Key Facts: |
|
Scope: | Design, engineering, supply, construction, testing, and commissioning works for the Central Production Facility (80,000 BPD – unattended) at Al Maleh, together with modifications to the Central Production Facility at Tanak in Syria. The project also included the fabrication, erection, construction, X-ray inspection, and hydrostatic testing of five storage tanks with a total storage capacity of 18,000 cubic meters. |
Eskişehir Compressor Station
Client: | BOTAŞ Petroleum Pipeline Corporation (Turkey) |
Project Location: | Eskişehir, Turkey |
Status: | Completed |
Key Facts: |
|
Scope: | ADEN was awarded the contract as a subcontractor for the supply, installation, construction, and commissioning works for the Eskişehir Compressor Station. Upon completion, the station was designed to provide the highest compression capacity among BOTAŞ compressor stations operating throughout Turkey. |
West Raman AP2 Gas Recycling Station (Enhanced Oil Recovery)
Client | TPAO (Turkish Petroleum Corporation) |
Project Location: | Batman, Turkey |
Status: | Completed |
Key Facts: |
|
Scope: | Participated in the construction, procurement, and management of the West Raman AP2 Gas Recycling Station -- an Enhanced Oil Recovery (EOR) facility for TPAO (Turkish Petroleum Corporation). The project was designed to recover and process associated gas produced from oil wells by separating and collecting surface gas, passing it through dehydration and filtration systems, and injecting the processed gas back into the reservoir through a dedicated pipeline network. This process supports increased reservoir pressure and improved long-term oil production. |
West Raman AP2 Gas Recycling Station (Enhanced Oil Recovery)
Client | TPAO (Turkish Petroleum Corporation) |
Project Location: | Batman, Turkey |
Status: | Completed |
Key Facts: |
|
Scope: | Participated in the construction, procurement, and management of the West Raman AP2 Gas Recycling Station -- an Enhanced Oil Recovery (EOR) facility for TPAO (Turkish Petroleum Corporation). The project was designed to recover and process associated gas produced from oil wells by separating and collecting surface gas, passing it through dehydration and filtration systems, and injecting the processed gas back into the reservoir through a dedicated pipeline network. This process supports increased reservoir pressure and improved long-term oil production. |
Berri Gas Plant & Qatif Facilities
Client | Saudi Aramco |
Project Location: | Kingdom of Saudi Arabia |
Status: | Completed |
Key Facts: |
|
Scope: | Participated in the construction and modernization of production facilities at the Berri Gas Plant and Qatif Facilities in the Kingdom of Saudi Arabia. The project involved the construction of new production infrastructure together with the revamping and expansion of existing facilities. The scope included both civil and mechanical works supporting ongoing operations within one of Saudi Arabia's major oil and gas producing regions. |